Schwank S100 Manual do Proprietário

Consulte online ou descarregue Manual do Proprietário para Fogões Schwank S100. Schwank S100 Owner`s manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 70
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 0
S100-F / ITB-F I&O Manual
IM101230
RD: SEP 2014
RL: 11A
INSTALLATION / OWNER’S MANUAL
Improper installation, adjustment, alteration, service or
maintenance can cause property damage, injury or death.
Read the installation and operating and maintenance instruc-
tions thoroughly before installing or servicing this equipment.
SAFETY ALERT:
This heater must be installed and serviced only by a trained gas service techni-
cian. Failure to comply could result in personal injury, death, fire and/or property
damage.
Do not store or use gasoline or other flammable vapours and liquids in the
vicinity of this or any other gas fired appliance.
IF YOU SMELL GAS:
 Extinguish any open flame
 Do not attempt to light this or any other appliance
 Don’t touch any electrical switch, or telephone
 Immediately call your gas supplier from a neighbor’s phone
 Follow any and all instruction from your gas supplier
 If your gas supplier is not available, call the fire department
WARNING
Keep this manual in a secure place .
Record for future reference:
Model #:
Serial #:
(located on heater rating label)
builderSchwank
S100 - S100U
Models
&
Builder
ITB - ITBU
Models
LOW INTENSITY TUBE TYPE INFRARED HEATERS
Vista de página 0
1 2 3 4 5 6 ... 69 70

Resumo do Conteúdo

Página 1 - ITB - ITBU

S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service or

Página 2

10 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A WARNING Improper installation, adjustment, alteration, service or maintenance can

Página 3 - LOW INTENSITY TUBE TYPE

11 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearance

Página 4

12 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space

Página 5 - IMPORTANT

13 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 3 SYSTEM ELBOW KIT - see page 50 for 180° elbow dimensions 90° elbows (JS-052

Página 6

14 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heate

Página 7 - PROMINENT LOCATION

15 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A IMPORTANT SPECIAL NOTES: READ FIRST 1. S100/ITB 100 x 20 ft ONLY: Special Tube Conn

Página 8

16 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.1 S100 / ITB STRAIGHT TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION For “U-Tube” Syste

Página 9

17 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.2 S100U/ITBU ‘U’-TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION For “Straight-Tube” Sys

Página 10 - WARNING

18 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A tube after turn box), prior to the 10 ft turbulator that is factory installed in the l

Página 11 - FIGURE 2

19 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 11 ‘U’-TUBE TYPICAL HANGER & SUPPORT SPACING 8 - STEEL TUBE(S) 9 - REFL

Página 12 - RL: 11A

2 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NOTICE: This manual is current for this product. Occasional revision of the product Ce

Página 13

20 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SPECIAL COUPLER INSTALLATION 1. Install first tube so that the welded seam along the

Página 14 - ‘U’ TUBE SYSTEM

21 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swaged en

Página 15

22 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.4 STRAIGHT TUBE SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to ear

Página 16

23 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.6 ‘U’ TUBE SEISMIC RESTRAINT In areas prone to earthquake, or as specified on a p

Página 17

24 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 10. REFLECTOR INSTALLATION S100-U / ITB-U - U’-TUBE: After burner and tubes have been

Página 18

25 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 19 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) 1. Reflector extensi

Página 19 - FIGURE 12 ‘U’ TUBE MODELS

26 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 12. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon

Página 20 -  100,000 x 20 ft

27 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HORIZONTAL VENT THROUGH THE SIDEWALL:  Any horizontal portion of the flue vent syste

Página 21 - ¼” hole at the female end

28 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A  Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizonta

Página 22

29 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A VERTICAL VENT THROUGH THE ROOF: It is the sole responsibility of the installer to adhe

Página 23

3 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TABLE OF CONTENTS TOPIC ...PAGE INST

Página 24 - S100 / ITB - STRAIGHT TUBE

30 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 13. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake. Ensu

Página 25

31 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 14. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be ins

Página 26 - WARNING

32 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16&quo

Página 27

33 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A The flue vent, and combustion air duct (if installed) must also be configured in such

Página 28

34 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 15. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGES 35 & 36) The heat

Página 29

35 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 18. FENWAL DSI: WIRING DIAGRAM: 24V OR 120 VOLT THERMOSTAT OPERATION SINGLE HEATER P

Página 30

36 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 19A. MULTIPLE TUBE HEATERS per 24VAC THERMOSTAT (Fenwal DSI)

Página 31

37 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 20. FENWAL DSI: SEQUENCE OF OPERATION / FLAME RECOVERY / SAFETY LOCKOUT Power Up / Sta

Página 32 - WARNING

38 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Flame Fault If at any time the main valve fails to close completely and maintains a f

Página 33

39 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A USE THE BLACK BARS BELOW AS A GUIDE FOR AD-JUSTMENT. USE THE BARS THAT COINCIDE W

Página 34

4 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial

Página 35

40 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 21-A. TROUBLESHOOTING GUIDE - FENWAL DSI (also see Heater Troubleshooting next page) S

Página 36

41 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SEQUENCE OF EVENTS (also see DSI Troubleshooting previous page) 21-B. TROUBLESHOOTING

Página 37 - THREE TRIAL MODEL)

42 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SH

Página 38

43 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 22. START-UP / COMMISSIONING SHEET COMMISSIONI

Página 39 - 3/16” 1/4”

44 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIG

Página 40

45 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 23A. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100 / ITB MODELS S100 & ITB ar

Página 41

46 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 23B. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100U / ITBU MODELS S100U & ITB

Página 42

47 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 24. MODEL INPUT RATINGS (BTUH ) AND DIMENSIONS BTUH INPUT 0’ to 4500’ ABOVE

Página 43 - WARNING START UP ‘SMOKE’

48 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Tube Length ‘L’ = center air intake to end 10’ 11’-3 3/4” ; 135 3/4” ; 345

Página 44

49 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 25A. TURBULATOR LENGTH & LOCATION IN SYSTEM: S100 / ITB - Straight Tube NOTE: Imp

Página 45

5 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Heater Expansion It is a normal condition that during heat-up and cool-down a tube hea

Página 46

50 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TURBULATOR LENGTH & LOCATION IN SYSTEM:

Página 47

51 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NG or LP S100 / ITB 130-15U 14' (4.3 m) VENT END - FACTORY INSTALLED IN TUBE N

Página 48

52 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A

Página 49 - x 60/70 *** 6’ (2 m) ***

53 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 27. HIGH ALTITUDE INSTALLATION Canada: Heaters can be installed to an altitude of

Página 50

54 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A ORIFICE CHART - ALTITUDE CONVERSION ~ SEE NOTES ON PREVIOUS PAGE ~ 27. HIGH ALTITUD

Página 51

55 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 28. OPTIONAL ACCESSORIES #2 Lion Chain (115 lb work load) - 200 ft roll Safety S

Página 52

56 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Fresh Air Intake Cap—Wall JS-0532-VC Clearance Sign - Required in some jurisdictions:

Página 53

57 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Options For 24V Thermostat Control: NOTE: Fenwal DSI has an onboard relay switch to c

Página 54 - Supplied

58 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 90 degree Aluminized Steel Elbow Kit (Kit includes: aluminized steel elbow, coupler,

Página 55 - 28. OPTIONAL ACCESSORIES

59 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Optional 29 REPLACEMENT PARTS S100 / ITB Burner # PART DESCRIPTIONMODELMODEL DASH #/

Página 56

6 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Clearance to combustibles Location of flammable or explosive objects, liquids or vapor

Página 57

60 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A # PART DESCRIPTIONMODELMODEL DASH #/ GAS TYPEPART # PART DESCRIPTION PRIM ARY5MAIN BUR

Página 58

61 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A # PART DESCRIPTIONMODELMODEL DASH #/ GAS TYPEPART # PART DESCRIPTION PRIM ARY20BLOCKED

Página 59 - S100 / ITB Burner

62 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A S100 / ITB & S100U / ITBU TUBE SYSTEM PARTS # PART DESCRIPTIONMODELMODEL DASH #/ G

Página 60

63 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: WIRING DIAGRAM: 120 VOLT THERMOSTAT OPERATION (24V Thermostat—next pag

Página 61

64 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: WIRING DIAGRAM: 24 VOLT THERMOSTAT OPERATION (120V Thermostat - previo

Página 62 - TUBE SYSTEM PARTS

65 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: SEQUENCE OF OPERATION The S87 ignition control module is powered by a

Página 63

66 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N: WIRING DIAGRAM: 120 VOLT THERMOSTAT CONTROL (24V Thermostat—next pa

Página 64

67 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N: WIRING : 24 V THERMOSTAT CONTROL SINGLE BURNER (120V Thermostat - p

Página 65

68 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N DSI: SEQUENCE OF OPERATION The MICRO 50N is a three trial ignition c

Página 66

69 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N IGNITION CONTROL - SPECS The MICRO 50N is a microprocessor-based DS

Página 67

7 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBL

Página 68

70 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: S100

Página 69

8 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national i

Página 70 - LIMITED WARRANTY CERTIFICATE

9 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are

Comentários a estes Manuais

Sem comentários