
S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A INSTALLATION / OWNER’S MANUAL Improper installation, adjustment, alteration, service or
10 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A WARNING Improper installation, adjustment, alteration, service or maintenance can
11 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 6. MOUNTING CLEARANCES This heater must be mounted with at least the minimum clearance
12 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A * RECOMMENDED MOUNTING HEIGHTS are typical to provide optimum comfort in general space
13 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 3 SYSTEM ELBOW KIT - see page 50 for 180° elbow dimensions 90° elbows (JS-052
14 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 8. SUSPENDING THE SYSTEM - GENERAL Inadequate or improper suspension of the tube heate
15 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A IMPORTANT SPECIAL NOTES: READ FIRST 1. S100/ITB 100 x 20 ft ONLY: Special Tube Conn
16 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.1 S100 / ITB STRAIGHT TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION For “U-Tube” Syste
17 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.2 S100U/ITBU ‘U’-TUBE SYSTEM ~ BURNER AND TUBE INSTALLATION For “Straight-Tube” Sys
18 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A tube after turn box), prior to the 10 ft turbulator that is factory installed in the l
19 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 11 ‘U’-TUBE TYPICAL HANGER & SUPPORT SPACING 8 - STEEL TUBE(S) 9 - REFL
2 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NOTICE: This manual is current for this product. Occasional revision of the product Ce
20 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SPECIAL COUPLER INSTALLATION 1. Install first tube so that the welded seam along the
21 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SPECIAL COUPLER INSTALLATION 1. Note the 2 holes opposite each other at the swaged en
22 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.4 STRAIGHT TUBE SEISMIC RESTRAINT - LATERAL AND LONGITUDINAL In areas prone to ear
23 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 9.6 ‘U’ TUBE SEISMIC RESTRAINT In areas prone to earthquake, or as specified on a p
24 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 10. REFLECTOR INSTALLATION S100-U / ITB-U - U’-TUBE: After burner and tubes have been
25 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A FIGURE 19 REFLECTOR EXTENSIONS (OPTIONAL - IF REQUIRED ) 1. Reflector extensi
26 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 12. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon
27 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HORIZONTAL VENT THROUGH THE SIDEWALL: Any horizontal portion of the flue vent syste
28 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Use approved 4" (10 cm) (JA-0528-XX) or 6" (15 cm) (JA-0529-XX) horizonta
29 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A VERTICAL VENT THROUGH THE ROOF: It is the sole responsibility of the installer to adhe
3 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TABLE OF CONTENTS TOPIC ...PAGE INST
30 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 13. COMBUSTION AIR DUCTING Do not install filters on the combustion air intake. Ensu
31 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 14. GAS SUPPLY - HEATER EXPANSION - FLEXIBLE GAS CONNECTION The gas supply must be ins
32 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NOTE: Access to the manifold pressure test port is on the top of the valve. A 3/16&quo
33 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A The flue vent, and combustion air duct (if installed) must also be configured in such
34 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 15. ELECTRICAL AND THERMOSTAT WIRING (WIRING DIAGRAMS PAGES 35 & 36) The heat
35 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 18. FENWAL DSI: WIRING DIAGRAM: 24V OR 120 VOLT THERMOSTAT OPERATION SINGLE HEATER P
36 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 19A. MULTIPLE TUBE HEATERS per 24VAC THERMOSTAT (Fenwal DSI)
37 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 20. FENWAL DSI: SEQUENCE OF OPERATION / FLAME RECOVERY / SAFETY LOCKOUT Power Up / Sta
38 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Flame Fault If at any time the main valve fails to close completely and maintains a f
39 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A USE THE BLACK BARS BELOW AS A GUIDE FOR AD-JUSTMENT. USE THE BARS THAT COINCIDE W
4 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A APPLICATION A gas-fired radiant tube heater may be installed for heating of commercial
40 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 21-A. TROUBLESHOOTING GUIDE - FENWAL DSI (also see Heater Troubleshooting next page) S
41 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A SEQUENCE OF EVENTS (also see DSI Troubleshooting previous page) 21-B. TROUBLESHOOTING
42 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A MAIN BURNER LIGHTS SYSTEM RUNS UNTIL CALL FOR HEAT ENDS CALL FOR HEAT ENDS: SYSTEM SH
43 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 22. START-UP / COMMISSIONING SHEET COMMISSIONI
44 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NOIF THIS IS A HIG
45 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 23A. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100 / ITB MODELS S100 & ITB ar
46 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 23B. BURNER & TUBE KIT ASSEMBLY CHART MODELS S100U / ITBU MODELS S100U & ITB
47 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 24. MODEL INPUT RATINGS (BTUH ) AND DIMENSIONS BTUH INPUT 0’ to 4500’ ABOVE
48 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Tube Length ‘L’ = center air intake to end 10’ 11’-3 3/4” ; 135 3/4” ; 345
49 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 25A. TURBULATOR LENGTH & LOCATION IN SYSTEM: S100 / ITB - Straight Tube NOTE: Imp
5 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Heater Expansion It is a normal condition that during heat-up and cool-down a tube hea
50 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TURBULATOR LENGTH & LOCATION IN SYSTEM:
51 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A NG or LP S100 / ITB 130-15U 14' (4.3 m) VENT END - FACTORY INSTALLED IN TUBE N
52 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A
53 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 27. HIGH ALTITUDE INSTALLATION Canada: Heaters can be installed to an altitude of
54 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A ORIFICE CHART - ALTITUDE CONVERSION ~ SEE NOTES ON PREVIOUS PAGE ~ 27. HIGH ALTITUD
55 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 28. OPTIONAL ACCESSORIES #2 Lion Chain (115 lb work load) - 200 ft roll Safety S
56 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Fresh Air Intake Cap—Wall JS-0532-VC Clearance Sign - Required in some jurisdictions:
57 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Options For 24V Thermostat Control: NOTE: Fenwal DSI has an onboard relay switch to c
58 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 90 degree Aluminized Steel Elbow Kit (Kit includes: aluminized steel elbow, coupler,
59 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Optional 29 REPLACEMENT PARTS S100 / ITB Burner # PART DESCRIPTIONMODELMODEL DASH #/
6 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A Clearance to combustibles Location of flammable or explosive objects, liquids or vapor
60 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A # PART DESCRIPTIONMODELMODEL DASH #/ GAS TYPEPART # PART DESCRIPTION PRIM ARY5MAIN BUR
61 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A # PART DESCRIPTIONMODELMODEL DASH #/ GAS TYPEPART # PART DESCRIPTION PRIM ARY20BLOCKED
62 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A S100 / ITB & S100U / ITBU TUBE SYSTEM PARTS # PART DESCRIPTIONMODELMODEL DASH #/ G
63 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: WIRING DIAGRAM: 120 VOLT THERMOSTAT OPERATION (24V Thermostat—next pag
64 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: WIRING DIAGRAM: 24 VOLT THERMOSTAT OPERATION (120V Thermostat - previo
65 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A HONEYWELL S87J: SEQUENCE OF OPERATION The S87 ignition control module is powered by a
66 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N: WIRING DIAGRAM: 120 VOLT THERMOSTAT CONTROL (24V Thermostat—next pa
67 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N: WIRING : 24 V THERMOSTAT CONTROL SINGLE BURNER (120V Thermostat - p
68 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N DSI: SEQUENCE OF OPERATION The MICRO 50N is a three trial ignition c
69 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A CHANNEL MICRO 50N IGNITION CONTROL - SPECS The MICRO 50N is a microprocessor-based DS
7 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLES* FIGURE 1 MINIMUM CLEARANCES TO COMBUSTIBL
70 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A LIMITED WARRANTY CERTIFICATE FOR GAS-FIRED INFRA-RED LOW INTENSITY TUBE HEATERS: S100
8 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A VENT END CLEARANCE: Clearances from the vent pipe are determined by local or national i
9 S100-F / ITB-F I&O Manual IM101230 RD: SEP 2014 RL: 11A 2. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are
Comentários a estes Manuais